USAspending · Contract award
LMT: National Aeronautics and Space Administration contract award
INTERFACE REGION IMAGING SPECTROGRAPH (IRIS). THE CONTRACTOR SHALL REFINE AND EVOLVE THE CONTRACTOR'S COST ESTIMATE FOR PHASES B-F FOR THE INTERFACE REGION IMAGING SPECTROGRAPH (IRIS) MISSION SUBMITTED IN RESPONSE TO NASA ANNOUNCEMENT OF OPPORTUNITY #NNH07ZDA003O FOR THE EXPLORERS PROJECTS DIVISION. THE PRIMARY TASKS IN PHASE B WILL INCLUDE THE GENERATION AND PRESENTATION OF THE SYSTEMS REQUIREMENTS REVIEW (SRR) AND THE PRELIMINARY DESIGN REVIEW (PDR). IN ORDER TO SUPPORT THESE REVIEWS, THE CONC
Follow LMT- First observed
- Nov 9, 2026, 5:18 PM EST
- Event / period date
- Oct 1, 2009
- Collected
- Nov 9, 2026, 5:18 PM EST
Why this is connected
Legal-name match: LOCKHEED MARTIN CORPORATION is LOCKHEED MARTIN CORP (https://www.sec.gov/Archives/edgar/data/936468/), differing only in punctuation, "the" or suffix spelling (Corp/Corporation).
Reported contract amount
$194,514,277.27
Source last modified: Nov 10, 2026
Award Amount is total obligations on this award, not a new incremental commitment or contract ceiling.
Source evidence
Read the source excerpt or record
{"internal_id":311365170,"Award ID":"NNG09FA40C","Recipient Name":"LOCKHEED MARTIN CORPORATION","Award Amount":194514277.27,"Description":"INTERFACE REGION IMAGING SPECTROGRAPH (IRIS). THE CONTRACTOR SHALL REFINE AND EVOLVE THE CONTRACTOR'S COST ESTIMATE FOR PHASES B-F FOR THE INTERFACE REGION IMAGING SPECTROGRAPH (IRIS) MISSION SUBMITTED IN RESPONSE TO NASA ANNOUNCEMENT OF OPPORTUNITY #NNH07ZDA003O FOR THE EXPLORERS PROJECTS DIVISION. THE PRIMARY TASKS IN PHASE B WILL INCLUDE THE GENERATION AND PRESENTATION OF THE SYSTEMS REQUIREMENTS REVIEW (SRR) AND THE PRELIMINARY DESIGN REVIEW (PDR). IN ORDER TO SUPPORT THESE REVIEWS, THE CONCEPT DEFINITION EFFORTS SHALL ENCOMPASS THE WORK REQUIRED TO UPDATE AND REFINE THE PROPOSAL'S SCIENCE INVESTIGATION OBJECTIVES AND PLANS (IF NECESSARY), INSTRUMENT AND SPACECRAFT CONCEPTS AND PERFORMANCE CHARACTERISTICS, AND SCIENCE OPERATIONS AND FLIGHT OPERATIONS PLANS AND CONCEPTS. THESE EFFORTS SHALL IDENTIFY THE CONDITIONS AND CONSTRAINTS NECESSARY FOR THE DEVELOPMENT OF AN INTEGRATED IRIS MISSION APPROACH. THE CONTRACTOR'S MISSION INTEGRATION EFFORTS SHALL INCLUDE CONSIDERATIONS FOR THE ACCOMMODATION OF THE IRIS OBSERVATORY ONTO THE LAUNCH VEHICLE. THE CONTRACTOR'S PHASE B PRELIMINARY DESIGN EFFORTS SHALL DEVELOP THE CSR AND SITE VISIT CONCEPTS INTO A PRELIMINARY DESIGN AND DEFINITION OF THE IRIS MISSION, INCLUDING ITS MISSION OPERATIONS CENTER (MOC) AND SCIENCE OPERATIONS CENTER (SOC). THE PRELIMINARY DESIGN REVIEW (PDR) SHALL BE HELD IN ACCORDANCE WITH NPR 7120.5D, NPR 7123.1A, AND GSFC STD 1001B. THE CONTRACTOR'S EFFORTS IN PHASE B SHALL FORM THE BASIS FOR FINAL ATION OF THE REMAINDER OF THE IRIS DEVELOPMENT AND OPERATIONAL PHASES (C, D, E AND F). DETAILED COST AND SCHEDULE ESTIMATES SHALL BE PREPARED AND SUBMITTED DURING PHASE B, WHICH DEFINES THE CONTRACTOR'S UPDATED BUDGET FOR PHASE B AND THE PLANNED BUDGETS FOR PHASE C, D, E AND F WORK. PERIODIC TECHNICAL AND PROGRAMMATIC INTERCHANGE MEETINGS AT BOTH THE CONTRACTOR'S FACILITY AND AT GSFC SHALL BE REQUIRED TO COORDINATE EFFORTS BETWEEN THE CONTRACTOR AND THE EXPLORERS PROJECTS OFFICE. THESE MAY BE CONDUCTED AS FACE-TO-FACE MEETINGS OR TELECONFERENCES, AS REQUIRED.","Awarding Agency":"National Aeronautics and Space Administration","Start Date":"2009-10-01","Last Modified Date":"2026-11-10 09:36:23","generated_internal_id":"CONT_AWD_NNG09FA40C_8000_-NONE-_-NONE-","Primary Place of Performance":{"location_country_code":"USA","country_name":"UNITED STATES","state_code":"CA","state_name":"California","city_name":"PALO ALTO","county_code":"085","county_name":"SANTA CLARA","congressional_code":"16","zip4":"943041121","zip5":"94304"},"awarding_agency_id":862,"agency_slug":"national-aeronautics-and-space-administration"}Price change after we could observe it
-1.17% LMT
Adjusted closing prices from Nov 10, 2026 to Nov 13, 2026. SPY changed 0.59% over the same dates. The start is the first available close after both publication and collection. This is a price comparison, not an executed trade, investor profit, or a backtested strategy.
Congressional trading in LMT
These disclosures provide context. Their presence does not establish a link between a trader and the event.
- Oct 13, 2026$15K–$50K
Rep. Kevin Hern (R-OK-1)
$15K–$50K · Traded Sep 23, 2026 · disclosed Oct 13, 2026 · Joint
Got $7K from the company’s PAC - Oct 13, 2026$15K–$50K
Rep. Kevin Hern (R-OK-1)
Sold (partial) Lockheed Martin LMT
$15K–$50K · Traded Sep 23, 2026 · disclosed Oct 13, 2026 · Joint
Got $7K from the company’s PAC - Oct 13, 2026$15K–$50K
Rep. Kevin Hern (R-OK-1)
Sold (partial) Lockheed Martin LMT
$15K–$50K · Traded Sep 17, 2026 · disclosed Oct 13, 2026 · Joint
Got $7K from the company’s PAC - Oct 13, 2026$15K–$50K
Rep. Kevin Hern (R-OK-1)
Sold (partial) Lockheed Martin LMT
$15K–$50K · Traded Sep 17, 2026 · disclosed Oct 13, 2026 · Joint
Got $7K from the company’s PAC - Sep 25, 2026$15K–$50K
Rep. Kevin Hern (R-OK-1)
Sold (partial) Lockheed Martin LMT
$15K–$50K · Traded Sep 2, 2026 · disclosed Sep 25, 2026 · Joint
Got $7K from the company’s PAC - Sep 25, 2026$15K–$50K
Rep. Kevin Hern (R-OK-1)
$15K–$50K · Traded Sep 2, 2026 · disclosed Sep 25, 2026 · Joint
Got $7K from the company’s PAC - Jul 21, 2026$1K–$15K
Sen. Alan Armstrong (R-OK)
$1K–$15K · Traded Mar 27, 2026 · disclosed Jul 21, 2026 · filed 116 days later
- Jul 16, 2026$15K–$50K
Sen. Tommy Tuberville (R-AL)
Sold (full) Lockheed Martin LMT
$15K–$50K · Traded Jun 8, 2026 · disclosed Jul 16, 2026 · Joint
Committee overlap: Armed ServicesGot $2K from the company’s PAC
Original documents control. Public records can be amended, and company connections may require interpretation. Nothing here is investment advice.