InsiderDB

USAspending · Contract award

BA: National Aeronautics and Space Administration contract award

IGF::OT::IGF ARC JET TEST IN SUPPORT OF FLEXIBLE THERMAL PROTECTION SYSTEM EVALUATION AND DEVELOPMENT THE SCOPE OF THIS TASK ORDER IS TO EVALUATE FTPS LAYUPS AND MATERIALS AT COMPARABLE OR HARSHER SIMULATED ATMOSPHERIC REENTRY FLIGHT CONDITIONS. FTPS MATERIALS AND SYSTEMS WILL BE TESTED UTILIZING THE TEST FACILITY FOR UP TO 10 WEEKS OF TOTAL TEST TIME AT THREE SPECIFIC TEST CONDITIONS THAT SIMULATE RELEVANT TEST ENVIRONMENTS.THE OBJECTIVES FOR THIS TASK ORDER ARE AS FOLLOWS: OBJECTIVE ONE: EVALU

Follow BA
First observed
Nov 9, 2026, 1:19 PM EST
Event / period date
Jun 19, 2017
Collected
Nov 9, 2026, 1:19 PM EST

Why this is connected

Legal-name match: THE BOEING COMPANY is BOEING CO (https://www.sec.gov/Archives/edgar/data/12927/), differing only in punctuation, "the" or suffix spelling (Corp/Corporation).

Reported contract amount

$538,852.33

Source last modified: Aug 14, 2026

Award Amount is total obligations on this award, not a new incremental commitment or contract ceiling.

Source evidence

Read the source excerpt or record
{"internal_id":291813365,"Award ID":"80LARC17F0001","Recipient Name":"THE BOEING COMPANY","Award Amount":538852.33,"Description":"IGF::OT::IGF ARC JET TEST IN SUPPORT OF FLEXIBLE THERMAL PROTECTION SYSTEM EVALUATION AND DEVELOPMENT THE SCOPE OF THIS TASK ORDER IS TO EVALUATE FTPS LAYUPS AND MATERIALS AT COMPARABLE OR HARSHER SIMULATED ATMOSPHERIC REENTRY FLIGHT CONDITIONS.  FTPS MATERIALS AND SYSTEMS WILL BE TESTED UTILIZING THE TEST FACILITY FOR UP TO 10 WEEKS OF TOTAL TEST TIME AT THREE SPECIFIC TEST CONDITIONS THAT SIMULATE RELEVANT TEST ENVIRONMENTS.THE OBJECTIVES FOR THIS TASK ORDER ARE AS FOLLOWS: OBJECTIVE ONE: EVALUATION OF FTPS LAYUPS AND MATERIALS AT FLIGHT-LIKE CONDITIONS SIMULATING A HEAT FLUX ENTRY CONDITION (SQUARE PULSE OR MISSION PROFILE IN STAGNATION OR SHEAR) OF 50 W/CM2 (HEAT FLUX BETWEEN 17 AND 50 W/CM2, PRESSURE BETWEEN 1.7 AND 10KPA).  OBJECTIVE TWO: EVALUATION OF FTPS LAYUPS AND MATERIALS AT FLIGHT-LIKE CONDITIONS SIMULATING A HEAT FLUX ENTRY CONDITION (SQUARE PULSE OR MISSION PROFILE IN STAGNATION OR SHEAR) OF 50-75 W/CM2 (HEAT FLUX BETWEEN 50 AND 75 W/CM2, PRESSURE BETWEEN 3 AND 6KPA).  OBJECTIVE THREE: EVALUATION OF FTPS LAYUPS AND MATERIALS AT FLIGHT-LIKE CONDITIONS SIMULATING A HEAT FLUX ENTRY CONDITION (SQUARE PULSE OR MISSION PROFILE IN STAGNATION OR SHEAR) OF 75-130 W/CM2 (HEAT FLUX BETWEEN 75 AND 130 W/CM2, PRESSURE BETWEEN 3 AND 10 KPA).","Awarding Agency":"National Aeronautics and Space Administration","Start Date":"2017-06-19","Last Modified Date":"2026-08-14 12:18:42","generated_internal_id":"CONT_AWD_80LARC17F0001_8000_NNL16AA04B_8000","awarding_agency_id":862,"agency_slug":"national-aeronautics-and-space-administration"}

Price change after we could observe it

-1.06% BA

Adjusted closing prices from Nov 10, 2026 to Nov 12, 2026. SPY changed 0.96% over the same dates. The start is the first available close after both publication and collection. This is a price comparison, not an executed trade, investor profit, or a backtested strategy.

Congressional trading in BA

These disclosures provide context. Their presence does not establish a link between a trader and the event.

Original documents control. Public records can be amended, and company connections may require interpretation. Nothing here is investment advice.